Automate SyteLine Shop Floor Control with AI
Shop floor control is where ERP meets reality. In SyteLine environments, the gap between planned and actual is often measured in hours of manual data entry, missed transactions, and inventory inaccuracies that ripple through the entire system. AI agents close this gap permanently.
The Shop Floor Data Gap
Most SyteLine shop floors operate 2-8 hours behind reality. Operators forget to clock transactions, move quantities are estimated rather than counted, and scrap reporting happens at shift end—if at all. This data lag makes real-time decision-making impossible.
- Average transaction backlog of 4-8 hours on most shop floors
- WIP accuracy typically 75-85% vs required 98%+
- Manual data entry consuming 30-45 minutes per operator per shift
- Lost visibility costing 5-10% of production capacity
AI-Powered Shop Floor Integration
Netray's shop floor agents interface with barcode scanners, IoT sensors, and machine PLCs to automatically capture and validate every transaction in real-time. The AI layer handles exceptions, validates quantities, and flags anomalies before they become problems.
- Real-time transaction capture with sub-second SyteLine updates
- Automated quality hold triggers based on statistical process data
- AI-driven labor efficiency analysis with optimization suggestions
- Predictive maintenance alerts integrated with production schedule
Shop Floor Transformation Results
Manufacturers achieve 99.5%+ WIP accuracy, eliminate manual data entry for operators, and gain true real-time production visibility. One electronics manufacturer improved labor efficiency 18% through AI-optimized work instructions and automated transaction processing.
See real-time shop floor automation in action—request a demo.
Related Resources
SyteLine Production Scheduling with AI
Transform SyteLine production scheduling with AI. Automated APS optimization, finite capacity scheduling, and real-time shop floor synchronization.
Infor SyteLineSyteLine Quality Management Automation
Automate SyteLine quality management with AI. SPC analysis, NCR processing, CAPA management, and supplier quality for Infor CloudSuite Industrial.