DEFENSE ELECTRONICS

Every board tells the truth.
Most test benches can't hear it.

A returned LRU sits on your bench: intermittent fault, no fault found, three trips through test, $40K of touch time, and it was a cold solder joint the whole time. NetRay builds AI that reads boards, test logs, and forty years of repair history the way your best tech reads a schematic, and it runs entirely inside your facility, because we know what industry you're in.

100% on-premise deployment73% NFF reduction, deployedCMMC 2.0 alignedFine-tuned on YOUR repair history
CMMC 2.0 ITAR J-STD-001 / IPC-A-610 shops MIL-STD test flows DMSMS / obsolescence Counterfeit avoidance (AS5553-adjacent) SyteLine & LN shops 100% on-prem AI CMMC 2.0 ITAR J-STD-001 / IPC-A-610 shops MIL-STD test flows DMSMS / obsolescence Counterfeit avoidance (AS5553-adjacent) SyteLine & LN shops 100% on-prem AI

Your best diagnostician retires in three years. His memory doesn't have an export.

Defense electronics runs on tribal knowledge: which failure signatures mean rework vs. scrap, which supplier's date codes to distrust, which “passed” test result is lying. That knowledge lives in a few heads and a mountain of unsearchable repair records. When the heads retire, the mountain stays, mute. A model fine-tuned on that mountain, running inside your fence, is the only retirement plan that scales.

40–60%
of returns are NFF, industry-wide
$40K+
touch time per chronic NFF unit
0
external calls, diagnosis stays in-facility

Six ways AI earns its place on the bench

Every one of these runs inside your facility. None of them phone home.

FLAGSHIP PRODUCT

AI-assisted PCB diagnosis & repair

PCBSpot deployed on your benches: root cause 4.2x faster, repair-history retrieval per failure signature.

$2.1M scrap avoided per deployment
Explore PCBSpot

NFF reduction program

Correlate test-stand logs, environment data, and field returns to catch the intermittents the bench misses.

73% NFF reduction in a quarter

Fine-tuned repair-knowledge model

Continued-pretraining on decades of repair records and tech manuals. Techs query in plain language; the model cites the 1998 case that matches.

Institutional knowledge, permanently retained
See the fine-tuning playbook

DMSMS & obsolescence intelligence

Agents watch BOMs against EOL notices and draft alternates with form-fit-function rationale for engineering review.

Last-time-buy decisions, made early

Counterfeit & supply-chain screening

Incoming inspection assist: date-code anomalies, supplier risk signals, and documentation cross-checks before parts hit stores.

Counterfeit risk caught before it's installed

CMMC evidence machine

Agents assemble and maintain the 800-171 evidence trail as a byproduct of doing the work, not a fire drill before the audit.

Audit-ready evidence, continuously
See GovRay

Test data, repair records, tech manuals, none of it should commute.

What are you holding?

This data doesn't commute. Bring the machine to it.

Every grade you selected is restricted from commercial cloud. The model, the fine-tuning run, and every query stay inside your perimeter. Correct. That's why PCBSpot has never made an external call.

Illustrative. Your compliance officer outranks this widget, bring them to the assessment.

4.2x
faster root cause
73%
NFF reduction
$2.1M
scrap avoided
100%
on-premise

“Our NFF rate dropped 73% in the first quarter. We stopped shipping boards back that weren't actually broken, and none of the diagnosis data ever left our facility.”

Defense Contractor: PCBSpot deployment, 100% on-premise

Frequently asked

Put forty years of repair wisdom on every bench.

A 30-minute deployment assessment: your data grades, your repair history, a straight answer on what a fine-tuned on-prem diagnosis stack costs, and what it saves. Run by people who've shipped it, not sold it.

30 min with a founderCustom ROI estimateNo commitment

Typically responds within 4 hours