Infor LN

AI-Powered Project Manufacturing for Infor LN

Infor LN excels at project-based manufacturing, but managing complex projects with thousands of WBS elements, multiple subcontractors, and evolving engineering requirements pushes even experienced teams to their limits. AI agents bring superhuman project control to LN environments.

Project Manufacturing Complexity

Engineer-to-order and project-based manufacturers using Infor LN face unique challenges. Each project is essentially a unique product with its own BOM, routing, procurement, and cost structure. Traditional project management tools can't integrate deeply enough with LN's project module.

  • Average complex project has 2,000-10,000 WBS elements
  • Cost variance detection lag: 2-4 weeks with manual review
  • Engineering change impact analysis: 3-5 days per change
  • Subcontractor coordination consuming 30% of project management time

AI Project Control for LN

Netray's project agents operate within Infor LN's project manufacturing framework, providing real-time earned value analysis, automated WBS health monitoring, predictive cost-at-completion calculations, and intelligent resource leveling.

  • Real-time earned value metrics (CPI, SPI, EAC, ETC) updated hourly
  • Automated WBS anomaly detection with root cause identification
  • Predictive project completion dates with confidence intervals
  • AI-optimized resource allocation across concurrent projects

Project Performance Improvements

Clients achieve 15-25% improvement in project margin, 60% reduction in cost overruns, and 90% improvement in estimate accuracy. A shipbuilding company saved $15M in the first year through AI-driven project cost control in Infor LN.

Master project manufacturing with AI—book a consultation.