Infor SyteLine

SyteLine Multi-Site Inventory Management Guide

Managing inventory across multiple SyteLine sites requires careful configuration of inter-site visibility, transfer order workflows, and consolidated on-hand reporting. Without proper setup, each site operates as a silo, leading to excess safety stock, missed demand signals, and costly emergency transfers. This guide covers the complete multi-site inventory architecture in Infor CloudSuite Industrial.

Cross-Site Inventory Visibility Configuration

SyteLine stores inventory at the site level in the item_whse table, with each site maintaining its own on-hand quantities, cost layers, and planning parameters. To enable cross-site visibility, you configure the Inter-Site Parameters form (SLInterSiteParms IDO) which controls which sites can view and request inventory from each other. The Items form allows you to flag items as inter-site enabled, and the Inventory Inquiry form can be extended through custom IDOs to aggregate on-hand across all sites in a single view.

  • Configure Inter-Site Parameters to define supply-demand relationships between each site pair
  • Enable the inter_site_supply flag on item_whse records for items available to other sites
  • Use the SLItemWhse IDO to query item-level on-hand, allocated, and available quantities per site
  • Build consolidated inventory views using cross-database queries or Infor ION data lake integration
  • Set up Enterprise Search in Mongoose to allow planners to search inventory across all registered sites

Inter-Site Transfer Order Management

Transfer orders in SyteLine move inventory between sites using a ship-from and ship-to model. The Transfer Orders form (SLTransfers IDO) creates a demand at the receiving site and a supply at the shipping site, both visible to MRP planning. Transit warehouses track in-transit inventory so it is not double-counted. Proper configuration of transfer lead times, shipping methods, and transit warehouses ensures accurate planning and prevents inventory discrepancies during inter-site movements.

  • Create transfer order workflows with approval routing for high-value inter-site movements
  • Configure transit warehouses on each site to track in-transit quantities separately from on-hand
  • Set inter-site transfer lead times on the item_whse record to include packing, shipping, and receiving time
  • Use transfer order templates for recurring replenishment patterns between distribution and manufacturing sites
  • Enable ASN (Advance Ship Notice) generation on inter-site transfers for receiving dock scheduling

Multi-Site Inventory Reporting and KPIs

Consolidated inventory reporting across SyteLine sites requires either cross-database views in SQL Server or integration through Infor ION and Birst analytics. Key metrics include total enterprise on-hand value, inventory turns by site, inter-site transfer frequency, and days-of-supply by location. The standard SyteLine inventory reports operate at the single-site level, so multi-site reporting typically requires custom report development using SSRS or the Mongoose report writer with cross-site data sources.

  • Build cross-site inventory valuation reports using linked server queries across SyteLine databases
  • Track inter-site transfer fill rates and lead time adherence to measure supply chain responsiveness
  • Configure Infor Birst dashboards to visualize enterprise-wide inventory turns and aging by site
  • Monitor excess and obsolete inventory across all sites to identify consolidation opportunities
  • Set up automated alerts when cross-site available quantity falls below minimum enterprise safety stock

Need help configuring multi-site inventory in SyteLine? Netray consultants specialize in cross-site visibility and transfer optimization. Book a consultation.